Case Study:
Turbine Halls, Battersea Power Station
Install Thermo Ash on Grad 'hidden-fix' system

Case Study: Turbine Halls, Battersea Power Station
Project Details
Project: Turbine Halls, Battersea Power Station
Location: London, UK
Product/Scope:
Install Thermo Ash on Grad 'hidden-fix' system
Architect: Wilkinson Eyre
Main Contractor: Mace
Sub Contractor: Outdoor Deck Company
Status: Complete

Project Description
Over 10,000 square metres of the Thermo Ash ‘hidden-fix’ system were supplied for multiple external areas on the Turbine Halls of the recently completed iconic Battersea Power Station including the private roof terraces and balconies of the sky villas on the roof of the building, and other residential and commercial spaces.
The use of the Grad system not only created stunning areas, but contributed to significant savings on the labour cost of installation.
The installation of Thermo Ash used Grad aluminium rails with factory-placed clips for perfect alignment, placed on Buzon UK’s PB range of pedestals where required.
Decking Systems

Cladding Systems

Finishes

Ballustrades








